- Established with initial charter capital of 230 billion VND.
2018 - 2019
- Increase charter capital to 800 billion VND.
- Groundbreaking and signing of power purchase contract for BCG Long An 1 (40.6 MW).
- Groundbreaking of BCG Long An 2 (100.5 MW)
- COD BCG Long An 1 (40.6 MW)
- Successfully issued VND 115.75 billion in convertible bonds for Hanwha Energy Corporation
2020
- Increase charter capital to 1,200 billion VND.
- Inauguration of BCG Long An 2 (100.5 MW).
- Successfully raised capital of more than 1,018 billion VND from Leader Energy.
- COD BCG Vinh Long (49.3 MW).
- COD Phu My (216 MW).
- Successfully installed 46.8 MW of rooftop solar power projects.
2021
- Inauguration of all 330 MW Phu My.
- Signed a development cooperation contract with SP Group with the goal of reaching 500 MW of rooftop solar power by 2025.
- Signed a development cooperation contract with Sembcorp with the goal of developing 1.5 GW of renewable energy projects.
- Successfully installed 52.3 MW of rooftop solar power projects.
2022
- Increase charter capital to 4,500 billion VND
- Successfully installed 74 MW of rooftop solar power projects.
- Aim to reach 2GW capacity by 2025.
- Set revenue target of VND 9,441 billion by 2026
Address: No. 27C - Quoc Huong Street - Thao Dien Ward - City. Thu Duc - City. Ho Chi Minh
Phone: +84 8 62.680.680
Disclosure Officer:
Email: [email protected]
Website: https://www.bcgenergy.com.vn/